Bay Point

Bay Point ADU Rules and Requirements (2026)

Yes, you can build an ADU in Bay Point. Bay Point is unincorporated, so Contra Costa County rules apply: a detached ADU can be up to 1,000 square feet, or 1,200 square feet on a lot of 12,000 square feet or more, set 4 feet from the side and rear property lines.

Contra Costa County
Last reviewed
November 20, 2026

At a glance

Largest detached ADU
1,000 to 1,200 sq ft
Height limit
16 ft, up to 18 ft
Side and rear setback
4 ft
Parking
1 space unless exempt
Permit review
60 days (state limit)

See what fits on your lot

Enter your address to find your property, explore your lot and view the plans that may fit it.

Check your property
Overview of rules in Bay Point

Bay Point has no city government. The Contra Costa County Department of Conservation and Development reviews ADUs here, against written rules and with no public hearing.

Most Bay Point lots are flat and modest in size, so the smaller county size limit usually applies. Homes within half a mile of the Pittsburg/Bay Point BART station or another transit stop do not need to add ADU parking. Next-door Pittsburg and Concord are cities with their own rules.

ADU Types Allowed

  • Detached ADU: a new, separate building on the lot.
  • Attached ADU: an addition to the main house.
  • Conversion ADU: a garage or other existing space turned into a home.
  • Junior ADU: up to 500 square feet inside a single-family home. The owner must live on the property if the Junior ADU shares a bathroom with the house.

Since 2025, a single-family lot can have one conversion ADU, one detached ADU and one Junior ADU.

Key ADU Regulations

How big can an ADU be in Bay Point? On a typical Bay Point lot, a detached ADU can be up to 1,000 sq ft. On a lot of 12,000 sq ft or more, or in an agricultural district, the limit is 1,200 sq ft. An attached ADU has the same caps and is also limited to 50% of the living area of the house, but 850 sq ft with one bedroom or 1,000 sq ft with more is always allowed.

How tall? State rule: 16 ft for a detached ADU, 18 ft near major transit, and up to 25 ft for an attached ADU. An ADU that meets the zone's regular setbacks can follow the zone's height limit.

Setbacks? 4 ft from the side and rear property lines. Conversions keep their existing setbacks.

Parking? One space, unless an exemption applies, such as converting existing space or being within half a mile of public transit. Parking removed for an ADU does not have to be replaced.

Permit Requirements

You apply to the county's Department of Conservation and Development for the ADU, then for a building permit.

Timeline for Permits

State law gives the county 60 days to approve or deny a complete ADU application. Corrections and resubmittals add time.

Zoning and Lot Requirements

Any Bay Point lot zoned for a house or apartments can have an ADU, as long as a legal home exists or is proposed.

  • Transit: lots near BART get parking and height benefits.
  • Small lots: the 4 ft setbacks decide what fits.
  • A Pittsburg mailing address does not mean Pittsburg's rules apply.

Local Considerations

  • County rules. Bay Point is unincorporated, so the Contra Costa County Department of Conservation and Development reviews ADUs under Chapter 82-24 of the County Ordinance Code, rewritten by Ordinance No. 2025-07 in May 2025.
  • Size by lot. A detached ADU can be 1,000 sq ft, or 1,200 sq ft on a lot of 12,000 sq ft or more. Most Bay Point lots are modest, so 1,000 sq ft is typical.
  • BART. Homes within half a mile of the Pittsburg/Bay Point BART station or another transit stop need no ADU parking and can build a bit taller.
  • Small lots. The 4 ft setbacks decide what fits on most lots.
  • City or county. A Pittsburg mailing address does not mean Pittsburg's rules apply.

Frequently Asked Questions

Can I build an ADU in Bay Point?

Yes. Any lot zoned for a house or apartments can have an ADU, as long as a legal home exists or is proposed.

How much does an ADU cost in Bay Point?

A real number comes from the whole project, not just the structure: design and engineering, permits and fees, site work such as trenching and sewer and power connections, and finishes. Your lot usually moves the price more than the ADU itself, which is why a feasibility review comes first. In Bay Point, local factors include tight setbacks on small lots, utility connections, and county permitting. See How much does an ADU cost in California? for how the pieces add up.

Does living near BART help?

Yes. Within half a mile of transit, no ADU parking is required and a detached ADU can be 18 ft.

Who approves ADUs in Bay Point?

Contra Costa County. Bay Point is unincorporated, even with a Pittsburg mailing address.

Is parking required for an ADU in Bay Point?

One space at most, and none for conversions, Junior ADUs or homes within half a mile of public transit.

Do I have to live on the property?

Not for an ADU. Under state law since January 1, 2026, owner occupancy applies only to a Junior ADU that shares a bathroom with the house.

Get Help Navigating ADU Rules in Bay Point

ADU regulations are constantly evolving and may vary by city, county, or even neighborhood. Before starting your project, it’s always best to consult with a trained professional or certified ADU Specialist to ensure your plans align with current local requirements.

On this page
OverviewADU types allowedKey regulationsPermit requirementsPermit timelineZoning and lot requirementsOfficial resources
See what fits on your lot
Enter your address to check what you can build on your property.
Check your property

Our work

See more
See ADU rules for all cities
Close

Check your property

Enter your address to see your lot and the plans that may fit it.

Get your ADU now

Get Free Estimate  →