Yes, you can build an ADU in Bay Point. Bay Point is unincorporated, so Contra Costa County rules apply: a detached ADU can be up to 1,000 square feet, or 1,200 square feet on a lot of 12,000 square feet or more, set 4 feet from the side and rear property lines.
Enter your address to find your property, explore your lot and view the plans that may fit it.
Bay Point has no city government. The Contra Costa County Department of Conservation and Development reviews ADUs here, against written rules and with no public hearing.
Most Bay Point lots are flat and modest in size, so the smaller county size limit usually applies. Homes within half a mile of the Pittsburg/Bay Point BART station or another transit stop do not need to add ADU parking. Next-door Pittsburg and Concord are cities with their own rules.
Since 2025, a single-family lot can have one conversion ADU, one detached ADU and one Junior ADU.
How big can an ADU be in Bay Point? On a typical Bay Point lot, a detached ADU can be up to 1,000 sq ft. On a lot of 12,000 sq ft or more, or in an agricultural district, the limit is 1,200 sq ft. An attached ADU has the same caps and is also limited to 50% of the living area of the house, but 850 sq ft with one bedroom or 1,000 sq ft with more is always allowed.
How tall? State rule: 16 ft for a detached ADU, 18 ft near major transit, and up to 25 ft for an attached ADU. An ADU that meets the zone's regular setbacks can follow the zone's height limit.
Setbacks? 4 ft from the side and rear property lines. Conversions keep their existing setbacks.
Parking? One space, unless an exemption applies, such as converting existing space or being within half a mile of public transit. Parking removed for an ADU does not have to be replaced.
You apply to the county's Department of Conservation and Development for the ADU, then for a building permit.
State law gives the county 60 days to approve or deny a complete ADU application. Corrections and resubmittals add time.
Any Bay Point lot zoned for a house or apartments can have an ADU, as long as a legal home exists or is proposed.
Yes. Any lot zoned for a house or apartments can have an ADU, as long as a legal home exists or is proposed.
A real number comes from the whole project, not just the structure: design and engineering, permits and fees, site work such as trenching and sewer and power connections, and finishes. Your lot usually moves the price more than the ADU itself, which is why a feasibility review comes first. In Bay Point, local factors include tight setbacks on small lots, utility connections, and county permitting. See How much does an ADU cost in California? for how the pieces add up.
Yes. Within half a mile of transit, no ADU parking is required and a detached ADU can be 18 ft.
Contra Costa County. Bay Point is unincorporated, even with a Pittsburg mailing address.
One space at most, and none for conversions, Junior ADUs or homes within half a mile of public transit.
Not for an ADU. Under state law since January 1, 2026, owner occupancy applies only to a Junior ADU that shares a bathroom with the house.
ADU regulations are constantly evolving and may vary by city, county, or even neighborhood. Before starting your project, it’s always best to consult with a trained professional or certified ADU Specialist to ensure your plans align with current local requirements.
ADU rules change often. This page is a general guide to help you get a sense of what may be possible where you live. It is not legal, zoning or permitting advice, it is no substitute for working with a qualified ADU professional, and it is not a promise that any project will be approved. We update these summaries as often as we can, but your city or county has the final say, and its current code always controls. Before you design, budget or build, confirm the requirements for your property with your local planning and building department.