Cherryland

Cherryland ADU Rules and Requirements (2026)

Yes, you can build an ADU in Cherryland. Cherryland is unincorporated, so Alameda County rules apply: a new detached ADU can be up to 850 square feet with one bedroom, or 1,200 square feet with two or more, 16 feet tall, set 4 feet from the side and rear property lines.

Alameda County
Last reviewed
November 20, 2026

At a glance

Largest detached ADU
850 to 1,200 sq ft
Height limit
16 ft
Side and rear setback
4 ft
Parking
None near transit
Permit review
60 days (state limit)

See what fits on your lot

Enter your address to find your property, explore your lot and view the plans that may fit it.

Check your property
Overview of rules in Cherryland

Cherryland has no city government. The Alameda County Planning Department reviews ADUs here, against written rules and with no public hearing.

Cherryland is known for long, deep lots left over from its orchard days. That shape suits a detached ADU well, since the county requires a new detached ADU to sit behind the main house or in the rear half of the lot. Next-door Hayward is a city with its own rules.

ADU Types Allowed

  • Detached ADU: a new, separate building behind the main house.
  • Attached ADU: an addition to the main house.
  • Conversion ADU: a garage or other existing space turned into a home.
  • Junior ADU: up to 500 square feet inside a single-family home. The owner must live on the property if the Junior ADU shares a bathroom with the house.

Under state law, a single-family lot can combine an ADU converted from existing space, a new detached ADU of up to 800 sq ft and a Junior ADU.

Key ADU Regulations

How big can an ADU be in Cherryland? A new detached ADU can be up to 850 sq ft with one bedroom or less, or 1,200 sq ft with two or more bedrooms, under Alameda County Ordinance 2026-1. An attached ADU is capped at half the size of the main house, or 850 sq ft with one bedroom and 1,000 sq ft with more, and 850 sq ft is always allowed. Cherryland's long, narrow lots often have room for the full two-bedroom size in the back half of the lot.

How tall? 16 ft for a new detached ADU, or 18 ft within half a mile of major transit, plus 2 ft more there to match the roof pitch of the house. An attached ADU can be 25 ft or the zone's limit, whichever is lower. No ADU can be more than two stories.

Setbacks? 4 ft from the side and rear property lines. A new detached ADU sits behind the main house or in the rear half of the lot, and one over 800 sq ft must be 6 ft from other buildings. Conversions keep their existing setbacks.

Parking? None within half a mile of public transit or for conversions. Much of Cherryland is close to the Hayward BART station and the Mission Boulevard bus lines. Otherwise one space, which can be tandem on the driveway.

Permit Requirements

You need a building permit from Alameda County. The Planning Department checks the zoning rules as part of that review. The ADU's exterior materials, color and roof shape must match the main house.

Timeline for Permits

State law gives the county 60 days to approve or deny a complete ADU application. Corrections and resubmittals add time.

Zoning and Lot Requirements

Any Cherryland lot zoned for a house or apartments can have an ADU, as long as a legal home exists or is proposed.

  • Deep lots: plan fire access and utility runs to the back of the lot early.
  • Lots with several homes follow the multifamily ADU rules.
  • Rentals must be 30 days or longer.

Local Considerations

  • County rules. Cherryland is unincorporated, so the Alameda County Planning Department reviews ADUs under County Ordinance 2026-1, adopted in January 2026.
  • Deep lots. Long, deep lots from the orchard days often fit a full two-bedroom ADU of up to 1,200 sq ft in the back half.
  • Placement. A new detached ADU must sit behind the main house or in the rear half of the lot.
  • Design match. The ADU's exterior materials, color and roof shape must match the main house.
  • Fire access and utilities. On deep lots, plan fire access and utility runs to the back early.

Frequently Asked Questions

Can I build an ADU in Cherryland?

Yes. Any lot zoned for a house or apartments can have an ADU, as long as a legal home exists or is proposed.

How much does an ADU cost in Cherryland?

A real number comes from the whole project, not just the structure: design and engineering, permits and fees, site work such as trenching and sewer and power connections, and finishes. Your lot usually moves the price more than the ADU itself, which is why a feasibility review comes first. In Cherryland, local factors include long utility runs on deep lots, fire access, and matching the main house's materials. See How much does an ADU cost in California? for how the pieces add up.

Does my ADU have to match my house?

Yes. Exterior materials, color and roof shape must match the main house.

Can a long lot fit a two-bedroom ADU?

Often. Many Cherryland lots fit up to 1,200 sq ft in the rear half.

Is parking required for an ADU in Cherryland?

One space at most, and none for conversions, Junior ADUs or homes within half a mile of public transit.

Do I have to live on the property?

Not for an ADU. Under state law since January 1, 2026, owner occupancy applies only to a Junior ADU that shares a bathroom with the house.

Get Help Navigating ADU Rules in Cherryland

ADU regulations are constantly evolving and may vary by city, county, or even neighborhood. Before starting your project, it’s always best to consult with a trained professional or certified ADU Specialist to ensure your plans align with current local requirements.

On this page
OverviewADU types allowedKey regulationsPermit requirementsPermit timelineZoning and lot requirementsOfficial resources
See what fits on your lot
Enter your address to check what you can build on your property.
Check your property

Our work

See more
See ADU rules for all cities
Close

Check your property

Enter your address to see your lot and the plans that may fit it.

Get your ADU now

Get Free Estimate  →