Yes, you can build an ADU in Lafayette. An ADU can be up to 1,200 sq ft with an ADU permit. A detached ADU of up to 800 sq ft, 16 ft tall and 4 ft from the side and rear property lines needs only a building permit.
Enter your address to find your property, explore your lot and view the plans that may fit it.
The City of Lafayette reviews ADU permits. Lafayette sorts ADUs into classes: Class A units (conversions and small detached ADUs) need only a building permit, and larger Class C ADUs need an ADU permit from the Zoning Administrator. The rules were last updated by Ordinance 695 in December 2024, and the figures on this page come from the city's ADU Handout. Lafayette, Orinda and Moraga are also developing shared pre-approved ADU plans.
Under state law, a single-family lot can combine an ADU converted from existing space, a new detached ADU of up to 800 sq ft and a Junior ADU. Multifamily lots can add up to two detached ADUs.
How big can an ADU be in Lafayette?
Up to 800 sq ft as a Class A ADU with only a building permit. Up to 1,200 sq ft as a Class C ADU with an ADU permit, not counting a garage or other non-living space.
How tall?
A detached Class A ADU can be 16 ft, and a Class C ADU 17 ft. An attached ADU can be 25 ft and no more than two stories.
Setbacks?
4 ft from the side and rear property lines. Class C ADUs also have a front setback. Conversions and same-footprint rebuilds can keep smaller setbacks.
Parking?
One off-street space for a Class C ADU with one or more bedrooms. State exemptions apply, such as homes within half a mile of public transit. Class A ADUs need none.
An ADU in Lafayette is filed through the city's online submittal portal. A typical application includes:
Building permits are issued through Contra Costa County after city planning review.
State law gives the city 60 days to approve or deny a complete ADU application. Corrections and resubmittals add time.
ADUs are allowed on lots with an existing or proposed single-family or multifamily home.
Yes. ADUs are allowed on lots with an existing or proposed single-family or multifamily home.
A real number comes from the whole project, not just the structure: design and engineering, permits and fees, site work such as trenching and sewer and power connections, and finishes. Your lot usually moves the price more than the ADU itself, which is why a feasibility review comes first. In Lafayette, local factors include hillside review, tree protection, and whether you stay under 800 sq ft. See How much does an ADU cost in California? for how the pieces add up.
Class A covers conversions and ADUs up to 800 sq ft with only a building permit. Class C covers larger ADUs, up to 1,200 sq ft, with an ADU permit.
Contra Costa County, after the city's planning review.
One space at most, and none for conversions, Junior ADUs or homes within half a mile of public transit.
Not for an ADU. Under state law since January 1, 2026, owner occupancy applies only to a Junior ADU that shares a bathroom with the house.
ADU regulations are constantly evolving and may vary by city, county, or even neighborhood. Before starting your project, it’s always best to consult with a trained professional or certified ADU Specialist to ensure your plans align with current local requirements.
ADU rules change often. This page is a general guide to help you get a sense of what may be possible where you live. It is not legal, zoning or permitting advice, it is no substitute for working with a qualified ADU professional, and it is not a promise that any project will be approved. We update these summaries as often as we can, but your city or county has the final say, and its current code always controls. Before you design, budget or build, confirm the requirements for your property with your local planning and building department.