Los Gatos

Los Gatos ADU Rules and Requirements (2026)

Yes, you can build an ADU in Los Gatos. An ADU can be up to 1,200 sq ft, most ground-floor ADUs can be 16 ft tall, and side and rear setbacks are 4 ft.

Santa Clara County
Last reviewed
November 19, 2026

At a glance

Largest detached ADU
1,200 sq ft
Height limit
16 ft
Side and rear setback
4 ft
Parking
1 space, often waived
Permit review
60 days (state limit)

See what fits on your lot

Enter your address to find your property, explore your lot and view the plans that may fit it.

Check your property
Overview of rules in Los Gatos

The Town of Los Gatos reviews ADU permits. The rules are in Town Code Section 29.10.320. The figures on this page come from the town's ADU summary handout, last updated April 2024. Cities update their ADU rules often, so confirm current figures with the town. Los Gatos gives a 10% floor area bonus for ADUs, and the first 800 sq ft of an ADU is exempt from floor area limits.

ADU Types Allowed

  • Detached ADU: a separate building on the same lot as the house.
  • Attached ADU: an addition to the house with its own entrance.
  • Conversion ADU: built inside the house or an existing accessory building.
  • Junior ADU: up to 500 sq ft inside the house, including an attached garage. The owner must live on the property if the Junior ADU shares a bathroom with the house.

A single-family lot can have one ADU and one Junior ADU. Multifamily lots can add two detached ADUs, plus conversions of non-living space.

Key ADU Regulations

How big can an ADU be in Los Gatos?

Up to 1,200 sq ft. ADUs are exempt from lot coverage limits.

How tall?

16 ft for most ground-floor ADUs. An ADU added to the second story of an existing two-story house can be 25 ft.

Setbacks?

4 ft from the side and rear property lines, and 5 ft from other structures. The front setback follows the zone. In hillside areas, ADUs follow the same setbacks as the main house.

Parking?

One space per ADU, with exceptions listed in the Town Code. State rule: none for conversions, Junior ADUs or homes within half a mile of public transit.

Permit Requirements

An ADU in Los Gatos needs a building permit from the town. A typical application includes:

  • Site plan with property lines, setbacks and existing buildings
  • Floor plans, elevations and structural details
  • Title 24 energy documents

Timeline for Permits

State law gives the town 60 days to approve or deny a complete ADU application. Corrections and resubmittals add time.

Zoning and Lot Requirements

New ADUs are allowed in the R-1, R-D, R-M, R-1D, HR and RC zones.

  • There is no minimum lot size for an ADU.
  • An ADU must fit within one story, with limited exceptions above an existing accessory building.
  • Hillside lots follow the town's hillside standards.
Get Help Navigating ADU Rules in Los Gatos

ADU regulations are constantly evolving and may vary by city, county, or even neighborhood. Before starting your project, it’s always best to consult with a trained professional or certified ADU Specialist to ensure your plans align with current local requirements.

On this page
OverviewADU types allowedKey regulationsPermit requirementsPermit timelineZoning and lot requirementsOfficial resources
See what fits on your lot
Enter your address to check what you can build on your property.
Check your property

Our work

See more
See ADU rules for all cities
Close

Check your property

Enter your address to see your lot and the plans that may fit it.

Get your ADU now

Get Free Estimate  →