Marin City ADU Rules and Requirements (2026)

Yes, you can build an ADU in Marin City. Marin City is unincorporated, so Marin County rules apply. An ADU of up to 800 square feet and 18 feet tall, set 4 feet from the side and rear property lines, is approved by right, and larger ADUs are possible where the lot's floor area limit allows.

Marin County
Last reviewed
November 19, 2026

At a glance

Largest detached ADU
800 to 1,200 sq ft
Height limit
18 ft
Side and rear setback
4 ft
Parking
None near transit
Permit review
60 days (state limit)

See what fits on your lot

Enter your address to find your property, explore your lot and view the plans that may fit it.

Check your property
Overview of rules in Marin City

Marin City has no city government. The Marin County Community Development Agency reviews ADUs here. An ADU that meets the county's written standards is approved with no public hearing.

Marin City has a mix of single-family homes, townhomes and apartments. Low-lying areas near the freeway flood in heavy rain and high tides, so check your flood zone first. Bus service along the Highway 101 corridor means many homes are within half a mile of transit and need no ADU parking. Next-door Sausalito is a city with its own rules.

ADU Types Allowed

  • Detached ADU: a new, separate building on the lot.
  • Attached ADU: an addition to the main house.
  • Conversion ADU: a garage or other existing space turned into a home.
  • Junior ADU: up to 500 square feet inside a single-family home. The owner must live on the property if the Junior ADU shares a bathroom with the house.

Apartment properties can convert non-living space and add detached ADUs under the multifamily rules.

Key ADU Regulations

How big can an ADU be in Marin City? Up to 800 sq ft by right. With an ADU permit, up to 1,200 sq ft if the lot stays within its floor area limit. Either way, 850 sq ft with one bedroom or 1,000 sq ft with two or more is allowed.

How tall? 18 ft for a by-right detached ADU, plus 2 ft to match the main roof. 25 ft for an attached ADU.

Setbacks? 4 ft from the side and rear property lines. Conversions keep their existing setbacks.

Parking? One space at most, and none for conversions or homes within half a mile of public transit.

Permit Requirements

You apply to the Marin County Community Development Agency. Planning checks the ADU standards, then Building and Safety reviews the construction plans. Townhome and condo owners also need their association's approval.

Timeline for Permits

State law gives the county 60 days to approve or deny a complete ADU application. Flood review adds time.

Zoning and Lot Requirements

Any Marin City lot zoned for homes can have an ADU, as long as a legal home exists or is proposed.

  • Flood zones: low-lying lots may need raised floors.
  • Attached homes: shared walls and association rules limit options.
  • The county's rules are in Development Code Section 22.32.120.

Local Considerations

  • County rules. Marin City is unincorporated, so the Marin County Community Development Agency reviews ADUs under Development Code Section 22.32.120. Next-door Sausalito has its own rules.
  • Two size paths. An 800 sq ft ADU is allowed by right. With an ADU permit, up to 1,200 sq ft if the lot stays within its floor area limit.
  • Flood zones. Low-lying areas near the freeway flood in heavy rain and high tides, so check your flood zone first.
  • Transit. Bus service on the Highway 101 corridor means many homes are within half a mile of transit and need no ADU parking.
  • Attached homes. Townhome and condo owners also need their association's approval, and shared walls limit options.

Frequently Asked Questions

Can I build an ADU in Marin City?

Yes. An 800 sq ft ADU set 4 ft from the side and rear lines is allowed by right on any lot zoned for homes.

How much does an ADU cost in Marin City?

A real number comes from the whole project, not just the structure: design and engineering, permits and fees, site work such as trenching and sewer and power connections, and finishes. Your lot usually moves the price more than the ADU itself, which is why a feasibility review comes first. In Marin City, local factors include raised floors in flood zones, hillside lots, and association approvals for attached homes. See How much does an ADU cost in California? for how the pieces add up.

Who approves ADUs in Marin City?

The Marin County Community Development Agency. Marin City is unincorporated.

Can I add an ADU to a townhome?

Sometimes. You need the association's approval, and shared walls limit what fits.

Is parking required for an ADU in Marin City?

Often not. Homes within half a mile of public transit need no ADU parking.

Do I have to live on the property?

Not for an ADU. Under state law since January 1, 2026, owner occupancy applies only to a Junior ADU that shares a bathroom with the house.

Get Help Navigating ADU Rules in Marin City

ADU regulations are constantly evolving and may vary by city, county, or even neighborhood. Before starting your project, it’s always best to consult with a trained professional or certified ADU Specialist to ensure your plans align with current local requirements.

On this page
OverviewADU types allowedKey regulationsPermit requirementsPermit timelineZoning and lot requirementsOfficial resources
See what fits on your lot
Enter your address to check what you can build on your property.
Check your property

Our work

See more
See ADU rules for all cities
Close

Check your property

Enter your address to see your lot and the plans that may fit it.

Get your ADU now

Get Free Estimate  →