Yes, you can build an ADU in Pleasant Hill. An ADU can be up to 1,200 square feet with an ADU permit. A detached ADU can be 16 feet tall, set 4 feet from the side and rear property lines.
Enter your address to find your property, explore your lot and view the plans that may fit it.
Pleasant Hill reviews ADUs against written standards, with no public hearing. The rules are in Section 18.15.050 of the Pleasant Hill Municipal Code, which the city updated in April 2026.
There are two paths. A detached ADU of 800 square feet or less needs only a building permit. A larger ADU, up to 1,200 square feet, needs an ADU permit and has to meet the zone's front setback. Homes within half a mile of the Pleasant Hill BART station or other public transit do not need to add ADU parking.
Under state law, a single-family lot can combine an ADU converted from existing space, a new detached ADU of up to 800 sq ft and a Junior ADU.
How big can an ADU be in Pleasant Hill? Up to 800 sq ft with a building permit only. Up to 1,200 sq ft with an ADU permit. An attached ADU is also limited to half the size of the main house.
How tall? 16 ft for a detached ADU, or 18 ft within half a mile of major transit, plus 2 ft to match the main roof. An attached ADU can be 25 ft and two stories, or the zone's limit if lower.
Setbacks? 4 ft from the side and rear property lines. Larger ADUs follow the zone's front setback.
Parking? One space, which can be tandem. None for conversions or homes within half a mile of public transit. Converted garage parking does not have to be replaced.
You apply to the City of Pleasant Hill for a building permit. Planning staff check the ADU standards as part of that review.
State law gives the city 60 days to approve or deny a complete ADU application. Corrections and resubmittals add time.
Any Pleasant Hill lot zoned for a house or apartments can have an ADU, as long as a legal home exists or is proposed.
Yes. Any lot zoned for a house or apartments can have an ADU, as long as a legal home exists or is proposed.
A real number comes from the whole project, not just the structure: design and engineering, permits and fees, site work such as trenching and sewer and power connections, and finishes. Your lot usually moves the price more than the ADU itself, which is why a feasibility review comes first. In Pleasant Hill, local factors include creek setbacks, hillside review, and whether you stay under 800 sq ft. See How much does an ADU cost in California? for how the pieces add up.
Only for ADUs over 800 sq ft. Smaller detached ADUs need just a building permit.
Up to 1,200 sq ft with an ADU permit. An attached ADU is also limited to half the main house.
One space at most, and none for conversions, Junior ADUs or homes within half a mile of public transit.
Not for an ADU. Under state law since January 1, 2026, owner occupancy applies only to a Junior ADU that shares a bathroom with the house.
ADU regulations are constantly evolving and may vary by city, county, or even neighborhood. Before starting your project, it’s always best to consult with a trained professional or certified ADU Specialist to ensure your plans align with current local requirements.
ADU rules change often. This page is a general guide to help you get a sense of what may be possible where you live. It is not legal, zoning or permitting advice, it is no substitute for working with a qualified ADU professional, and it is not a promise that any project will be approved. We update these summaries as often as we can, but your city or county has the final say, and its current code always controls. Before you design, budget or build, confirm the requirements for your property with your local planning and building department.