Yes, you can build an ADU in Ross. An ADU can be up to 800 square feet with one bedroom or 1,000 square feet with two, set 4 feet from the side and rear property lines. A detached ADU can be 18 feet tall.

Marin County
Last reviewed
November 19, 2026

At a glance

Largest detached ADU
800 to 1,000 sq ft
Height limit
18 ft
Side and rear setback
4 ft
Parking
1 space unless exempt
Permit review
60 days (state limit)

See what fits on your lot

Enter your address to find your property, explore your lot and view the plans that may fit it.

Check your property
Overview of rules in Ross

Ross approves an ADU that meets its written standards with no public hearing. Anything beyond those standards, such as more size or height, needs a discretionary ADU Exception Permit.

Ross is small, wooded and protective of its character, and most building projects here go through design review. ADUs are the exception, as long as you stay inside the written limits. Lots near Corte Madera Creek are in a flood zone, and hillside lots bring tree and slope questions.

ADU Types Allowed

  • Detached ADU: a new, separate building on the lot.
  • Attached ADU: an addition to the main house.
  • Conversion ADU: a garage or other existing space turned into a home.
  • Junior ADU: up to 500 square feet, allowed on any single-family lot with a main house. The owner must live on the property if the Junior ADU shares a bathroom with the house.

Key ADU Regulations

How big can an ADU be in Ross? Up to 800 sq ft with one bedroom or less, or 1,000 sq ft with two bedrooms, attached or detached. Two bedrooms is the maximum. Up to 1,200 sq ft is possible with an ADU exception, which comes with a rent restriction for very low-income tenants.

How tall? 18 ft for a detached ADU and 25 ft for an attached ADU. More height needs an ADU Exception Permit.

Setbacks? 4 ft from the side and rear property lines, and 3 ft between a detached ADU and other buildings.

Parking? One space, which can be tandem on the driveway. None for conversions or homes within half a mile of public transit.

Permit Requirements

You apply to the Town of Ross Building and Planning Department. An ADU inside the written limits gets a staff-level review. An ADU Exception Permit is a separate, discretionary application.

Timeline for Permits

State law gives the town 60 days to approve or deny a complete application for an ADU that meets the written standards. Exception permits take longer.

Zoning and Lot Requirements

Any Ross lot in a single-family zone with a main house can have an ADU.

  • Flood zones: lots near the creek may need raised floors.
  • Trees: protected trees limit where you can build.
  • Hillsides: slope and fire access limit what fits.

Local Considerations

  • Written limits. Ross approves an ADU that meets its written standards with no public hearing, even though most other projects in town go through design review.
  • Exception permit. More size or height needs a discretionary ADU Exception Permit. Going to 1,200 sq ft comes with a rent restriction for very low-income tenants.
  • Two bedrooms max. Up to 800 sq ft with one bedroom or less, or 1,000 sq ft with two.
  • State review. The state housing department sent Ross findings on its ADU ordinance in May 2024.
  • Creek, trees and slopes. Lots near Corte Madera Creek are in a flood zone, protected trees limit placement, and hillsides bring fire access questions.

Frequently Asked Questions

Can I build an ADU in Ross?

Yes. Any lot in a single-family zone with a main house can have an ADU, and one that meets the written limits skips design review.

How much does an ADU cost in Ross?

A real number comes from the whole project, not just the structure: design and engineering, permits and fees, site work such as trenching and sewer and power connections, and finishes. Your lot usually moves the price more than the ADU itself, which is why a feasibility review comes first. In Ross, local factors include raised floors in flood zones, protected trees, and hillside foundations. See How much does an ADU cost in California? for how the pieces add up.

What is an ADU Exception Permit?

A discretionary approval for an ADU larger or taller than the written limits. It takes longer and is not guaranteed.

How tall can my ADU be?

18 ft detached and 25 ft attached under the written limits.

Is parking required for an ADU in Ross?

One space at most, and none for conversions, Junior ADUs or homes within half a mile of public transit.

Do I have to live on the property?

Not for an ADU. Under state law since January 1, 2026, owner occupancy applies only to a Junior ADU that shares a bathroom with the house.

Get Help Navigating ADU Rules in Ross

ADU regulations are constantly evolving and may vary by city, county, or even neighborhood. Before starting your project, it’s always best to consult with a trained professional or certified ADU Specialist to ensure your plans align with current local requirements.

On this page
OverviewADU types allowedKey regulationsPermit requirementsPermit timelineZoning and lot requirementsOfficial resources
See what fits on your lot
Enter your address to check what you can build on your property.
Check your property

Our work

See more
See ADU rules for all cities
Close

Check your property

Enter your address to see your lot and the plans that may fit it.

Get your ADU now

Get Free Estimate  →