Yes, you can build an ADU in Ross. An ADU can be up to 800 square feet with one bedroom or 1,000 square feet with two, set 4 feet from the side and rear property lines. A detached ADU can be 18 feet tall.
Enter your address to find your property, explore your lot and view the plans that may fit it.
Ross approves an ADU that meets its written standards with no public hearing. Anything beyond those standards, such as more size or height, needs a discretionary ADU Exception Permit.
Ross is small, wooded and protective of its character, and most building projects here go through design review. ADUs are the exception, as long as you stay inside the written limits. Lots near Corte Madera Creek are in a flood zone, and hillside lots bring tree and slope questions.
How big can an ADU be in Ross? Up to 800 sq ft with one bedroom or less, or 1,000 sq ft with two bedrooms, attached or detached. Two bedrooms is the maximum. Up to 1,200 sq ft is possible with an ADU exception, which comes with a rent restriction for very low-income tenants.
How tall? 18 ft for a detached ADU and 25 ft for an attached ADU. More height needs an ADU Exception Permit.
Setbacks? 4 ft from the side and rear property lines, and 3 ft between a detached ADU and other buildings.
Parking? One space, which can be tandem on the driveway. None for conversions or homes within half a mile of public transit.
You apply to the Town of Ross Building and Planning Department. An ADU inside the written limits gets a staff-level review. An ADU Exception Permit is a separate, discretionary application.
State law gives the town 60 days to approve or deny a complete application for an ADU that meets the written standards. Exception permits take longer.
Any Ross lot in a single-family zone with a main house can have an ADU.
Yes. Any lot in a single-family zone with a main house can have an ADU, and one that meets the written limits skips design review.
A real number comes from the whole project, not just the structure: design and engineering, permits and fees, site work such as trenching and sewer and power connections, and finishes. Your lot usually moves the price more than the ADU itself, which is why a feasibility review comes first. In Ross, local factors include raised floors in flood zones, protected trees, and hillside foundations. See How much does an ADU cost in California? for how the pieces add up.
A discretionary approval for an ADU larger or taller than the written limits. It takes longer and is not guaranteed.
18 ft detached and 25 ft attached under the written limits.
One space at most, and none for conversions, Junior ADUs or homes within half a mile of public transit.
Not for an ADU. Under state law since January 1, 2026, owner occupancy applies only to a Junior ADU that shares a bathroom with the house.
ADU regulations are constantly evolving and may vary by city, county, or even neighborhood. Before starting your project, it’s always best to consult with a trained professional or certified ADU Specialist to ensure your plans align with current local requirements.
ADU rules change often. This page is a general guide to help you get a sense of what may be possible where you live. It is not legal, zoning or permitting advice, it is no substitute for working with a qualified ADU professional, and it is not a promise that any project will be approved. We update these summaries as often as we can, but your city or county has the final say, and its current code always controls. Before you design, budget or build, confirm the requirements for your property with your local planning and building department.