Yes, you can build an ADU in San Carlos. An ADU can be up to 50% of the size of the main house, and 800 sq ft is always allowed. A detached ADU can be 16 ft tall, or 18 ft near transit, and side and rear setbacks are 4 ft.
Enter your address to find your property, explore your lot and view the plans that may fit it.
The City of San Carlos reviews ADU permits with no public hearing. The rules are in Section 18.23.210 of the San Carlos Municipal Code, and the figures on this page come from the code as current through Ordinance 1637 (June 2026). The city is updating its ADU ordinance again, with a commission hearing set for December 2026, so confirm current figures with the city.
Under state law, a single-family lot can combine an ADU converted from existing space, a new detached ADU of up to 800 sq ft and a Junior ADU.
How big can an ADU be in San Carlos?
The code sets no single square-foot cap. An ADU must fit the zone's floor area and lot coverage limits, and on a lot with an existing house it cannot be more than 50% of the size of that house. An ADU of up to 800 sq ft is always allowed.
How tall?
A detached ADU can be 16 ft, or 18 ft near transit or when the main house has more than one story. An attached ADU can be 25 ft or the zone's limit, whichever is lower.
Setbacks?
4 ft from the side and rear property lines. Conversions need no added setback.
Parking?
One space per ADU, which can be tandem in the driveway. None is required in the cases state law lists, such as conversions and homes within half a mile of public transit.
The city suggests talking with Planning staff first. Then submit the ADU or Junior ADU application to the Building Department with:
State law gives the city 60 days to approve or deny a complete ADU application. Corrections and resubmittals add time.
ADUs are allowed in the single-family and multifamily zones on lots with an existing or proposed home.
Yes. An ADU must fit the lot's floor area and coverage limits, but an 800 sq ft ADU set 4 ft from the side and rear lines is always allowed.
A real number comes from the whole project, not just the structure: design and engineering, permits and fees, site work such as trenching and sewer and power connections, and finishes. Your lot usually moves the price more than the ADU itself, which is why a feasibility review comes first. In San Carlos, local factors include hillside grading and access, impact fees over 750 sq ft, and floor area limits. See How much does an ADU cost in California? for how the pieces add up.
16 ft detached, or 18 ft near transit or when the main house has more than one story. An attached ADU can be 25 ft or the zone's limit, whichever is lower.
Possibly. The code was updated through June 2026 and further updates have been in progress, so confirm current rules with the city.
One space, which can be tandem in the driveway, but none for conversions or homes within half a mile of public transit.
Not for an ADU. Under state law since January 1, 2026, owner occupancy applies only to a Junior ADU that shares a bathroom with the house.
ADU regulations are constantly evolving and may vary by city, county, or even neighborhood. Before starting your project, it’s always best to consult with a trained professional or certified ADU Specialist to ensure your plans align with current local requirements.
ADU rules change often. This page is a general guide to help you get a sense of what may be possible where you live. It is not legal, zoning or permitting advice, it is no substitute for working with a qualified ADU professional, and it is not a promise that any project will be approved. We update these summaries as often as we can, but your city or county has the final say, and its current code always controls. Before you design, budget or build, confirm the requirements for your property with your local planning and building department.