Yes, you can build an ADU in Santa Monica. A detached ADU can be two stories and 24 feet tall, set 4 feet from the side and rear property lines. It can be up to 850 square feet for a studio or one bedroom, or 1,200 square feet with two or more bedrooms. No parking is required.
Enter your address to find your property, explore your lot and view the plans that may fit it.
Santa Monica allows up to four accessory units on a lot with a single home: one converted ADU, one Junior ADU, one detached ADU and, in the R1 district, one more attached or detached ADU.
The rules are in the Santa Monica Municipal Code, Section 9.31.025. ADUs and Junior ADUs are approved ministerially, with no design review or public hearing. They need only a building permit, plus a coastal permit or waiver for lots in the Coastal Zone.
Santa Monica allows four types of ADU.
Multifamily properties can convert existing non-living space into ADUs and add up to two detached ADUs.
How big can an ADU be in Santa Monica?
How tall can an ADU be?
What are the setbacks?
Is parking required?
No. Santa Monica does not require parking for an ADU or a Junior ADU, and parking removed to build one does not have to be replaced.
You apply for a building permit with the city. A typical submittal includes:
A land survey is required for an ADU of more than one story or on a sloped lot. Junior ADUs and R1 ADUs also need a recorded deed restriction, which you apply for online. ADUs and Junior ADUs cannot be rented for 30 days or less.
State law gives Santa Monica 60 days to approve or deny a complete ADU application.
The 60 days start once the application is complete, so corrections and resubmittals add time. Properties in the coastal zone can take longer.
Acton ADU prepares a feasibility package before design begins. It is designed to reduce surprises by checking your lot against these rules first.
ADUs are allowed on Santa Monica lots with a single home or a multifamily building. There is no minimum lot size.
The City of Santa Monica has the final say, and its current code always controls. Start here:
Rules change often, and this page is not legal advice or a substitute for working with a qualified ADU professional. Confirm the current requirements for your property with the city before you design, budget or build.
Up to four: one converted ADU, one Junior ADU, one detached ADU and, in the R1 district, one more attached or detached ADU that is deed restricted as a rental or sold as a condominium.
A real number comes from the whole project, not just the structure: design and engineering, permits and fees, site work such as trenching and sewer and power connections, and finishes. Your lot usually moves the price more than the ADU itself, which is why a feasibility review comes first. In Santa Monica, the Coastal Zone across much of the city can add a separate coastal permit, coastal material premiums and a longer approval timeline. See How much does an ADU cost in California? for how the pieces add up.
No. On-site parking is not required, and parking removed to build an ADU does not have to be replaced.
Converted and detached ADUs can be sold separately as condominiums under SMMC 9.31.026. A Junior ADU cannot be sold apart from the house.
No. Rentals of 30 days or less are not permitted for any ADU or Junior ADU.
If your lot is in the Coastal Zone, you may need a Coastal Development Permit or waiver from the California Coastal Commission in addition to the city building permit.
Not for an ADU. The city's November 2025 guide requires owner occupancy for a Junior ADU. Under state law since January 1, 2026, that applies only when the Junior ADU shares a bathroom with the house.
ADU regulations are constantly evolving and may vary by city, county, or even neighborhood. Before starting your project, it’s always best to consult with a trained professional or certified ADU Specialist to ensure your plans align with current local requirements.
ADU rules change often. This page is a general guide to help you get a sense of what may be possible where you live. It is not legal, zoning or permitting advice, it is no substitute for working with a qualified ADU professional, and it is not a promise that any project will be approved. We update these summaries as often as we can, but your city or county has the final say, and its current code always controls. Before you design, budget or build, confirm the requirements for your property with your local planning and building department.