Yes, you can build an ADU in Saratoga. A detached ADU can be up to 1,000 sq ft and 16 ft tall, an attached ADU can be up to 1,200 sq ft, and side and rear setbacks are 4 ft.
Enter your address to find your property, explore your lot and view the plans that may fit it.
The City of Saratoga reviews ADU permits. The rules for single-family lots are in Section 15-56.020 of the Saratoga Municipal Code, and the figures on this page come from the city's ADU handout dated August 2024. Saratoga is more generous than most cities on unit count, and it offers a floor area bonus and fee waivers for ADUs that are deed-restricted as affordable. Cities update their ADU rules often, so confirm current figures with the city.
A single-family lot can have one attached ADU, one detached ADU and up to two Junior ADUs.
How big can an ADU be in Saratoga?
A detached ADU can be up to 1,000 sq ft. An attached ADU can be up to 1,200 sq ft of living area and no more than 50% of the existing house, but 800 sq ft is always allowed. An ADU in the front setback is limited to 800 sq ft.
How tall?
A detached ADU can be 16 ft, or 18 ft within half a mile of transit or when it meets the zone's regular setbacks. An attached ADU can be 25 ft or the limit for the main house, whichever is lower. Anything over 18 ft needs Design Review.
Setbacks?
4 ft from the side and rear property lines. An attached ADU follows the front setback for the main house.
Parking?
One uncovered off-street space. None is required for a Junior ADU, a conversion, or an ADU within half a mile of transit. Garage parking removed for an ADU does not have to be replaced.
Saratoga uses two steps. First a planning application, which the city says gets feedback in about 15 days. Then a building permit. Expect to provide:
State law gives the city 60 days to approve or deny a complete ADU application. Corrections and resubmittals add time.
ADUs are allowed on lots with an existing or approved home.
Yes. A detached ADU can be up to 1,000 sq ft, and an attached ADU up to 1,200 sq ft, with 800 sq ft always allowed.
A real number comes from the whole project, not just the structure: design and engineering, permits and fees, site work such as trenching and sewer and power connections, and finishes. Your lot usually moves the price more than the ADU itself, which is why a feasibility review comes first. In Saratoga, local factors include hillside grading and fire rules, matching the main house's design, and fee waivers for affordable units. See How much does an ADU cost in California? for how the pieces add up.
Yes. On lots of 10,000 sq ft or more, a deed-restricted ADU gets extra floor area and coverage plus fee waivers.
16 ft detached, or 18 ft near transit or at the zone's regular setbacks. Anything over 18 ft needs Design Review.
One space at most, and none for conversions, Junior ADUs or homes within half a mile of public transit.
Not for an ADU. Under state law since January 1, 2026, owner occupancy applies only to a Junior ADU that shares a bathroom with the house.
ADU regulations are constantly evolving and may vary by city, county, or even neighborhood. Before starting your project, it’s always best to consult with a trained professional or certified ADU Specialist to ensure your plans align with current local requirements.
ADU rules change often. This page is a general guide to help you get a sense of what may be possible where you live. It is not legal, zoning or permitting advice, it is no substitute for working with a qualified ADU professional, and it is not a promise that any project will be approved. We update these summaries as often as we can, but your city or county has the final say, and its current code always controls. Before you design, budget or build, confirm the requirements for your property with your local planning and building department.