San Jose

San Jose ADU Rules and Requirements (2026)

Yes, you can build an ADU in San Jose. A detached ADU can be up to 1,000 sq ft on lots of 9,000 sq ft or less, and 1,200 sq ft on larger lots. A one-story ADU can be 18 ft tall, and side and rear setbacks are 4 ft.

Santa Clara County
Last reviewed
November 19, 2026

At a glance

Largest detached ADU
1,000 to 1,200 sq ft
Height limit
18 ft, up to 25 ft
Side and rear setback
4 ft
Parking
None required
Permit review
60 days (state limit)

See what fits on your lot

Enter your address to find your property, explore your lot and view the plans that may fit it.

Check your property
Overview of rules in San Jose

The City of San Jose reviews ADU permits through its Development Services Permit Center. The rules are in Title 20 of the San Jose Municipal Code, the Zoning Code. San Jose runs a Preapproved ADU program with plans from outside designers that the city has already reviewed, which shortens plan check.

San Jose was the first city in California to let ADUs be sold separately as condominiums, starting in July 2024. The city has been updating its ADU rules to match state law, so confirm size and height figures with the city before you design.

ADU Types Allowed

  • Detached ADU: a separate building on the same lot as the house.
  • Attached ADU: an addition to the house.
  • Conversion ADU: built inside existing space, such as a garage.
  • Junior ADU: up to 500 sq ft inside the house. The owner must live on the property if the Junior ADU shares a bathroom with the house.

Under state law, a single-family lot can combine an ADU converted from existing space, a new detached ADU of up to 800 sq ft and a Junior ADU. Lots with a duplex can also add ADUs.

Key ADU Regulations

How big can an ADU be in San Jose?

Up to 1,000 sq ft on lots of 9,000 sq ft or less, and up to 1,200 sq ft on lots over 9,000 sq ft. An ADU does not count toward the floor area ratio that triggers a Single-Family House Permit.

How tall?

A one-story detached ADU can be 18 ft. A two-story ADU can be 24 ft, and the city's zoning update raises that to 25 ft.

Setbacks?

4 ft from the side and rear property lines. The front setback follows the lot's zoning district.

Parking?

None required, according to the city's ADU Universal Checklist (September 2026).

Permit Requirements

An ADU in San Jose needs a building permit, filed through the city's online permit portal. Expect to provide:

  • Site plan showing the house, the ADU, setbacks and easements
  • Floor plans, elevations, structural details and Title 24 energy documents
  • Fire hydrant distance and water flow information

Timeline for Permits

State law gives the city 60 days to approve or deny a complete ADU application. Corrections and resubmittals add time. Preapproved plans move faster.

Zoning and Lot Requirements

ADUs are allowed on lots with a legally built single-family home, duplex or multifamily building.

  • There is no minimum lot size.
  • Open code enforcement cases must be cleared first.
  • Flood zones, creeks, hillsides and historic sites add review.

Local Considerations

  • ADU Ally. San Jose has staff dedicated to helping homeowners with ADU questions and permits. Reach the ADU Ally at adu.ally@sanjoseca.gov or (408) 793-5302.
  • Selling an ADU as a condo. San Jose approved the first ADU condominium in California in August 2025. To sell an ADU separately, you first apply for a condominium conversion of the house and the ADU.
  • Preapproved plans. The city lists preapproved ADU vendors whose plans move through review faster. Acton ADU's Manzanita i448 is one of them.
  • Fees. School and parkland impact fees do not apply to ADUs under 750 sq ft. For larger ADUs, contact your school district about its fees.
  • Utilities. An ADU can share utilities with the main house or have its own.

Frequently Asked Questions

Can I build an ADU in San Jose?

Yes. A detached ADU can be up to 1,000 sq ft on lots of 9,000 sq ft or less and 1,200 sq ft on larger lots, with 4 ft side and rear setbacks.

How much does an ADU cost in San Jose?

A real number comes from the whole project, not just the structure: design and engineering, permits and fees, site work such as trenching and sewer and power connections, and finishes. Your lot usually moves the price more than the ADU itself, which is why a feasibility review comes first. In San Jose, local factors include older tract-home electrical panels and sewer laterals, expansive clay soils, impact fees on ADUs of 750 sq ft or more, and expedited permit paths that smaller projects can qualify for. See How much does an ADU cost in California? for how the pieces add up.

Can I sell my San Jose ADU separately?

Yes. San Jose allows ADU condominium conversions, and approved the first one in California in August 2025. You apply for a condominium conversion of the house and the ADU first.

Does San Jose have preapproved ADU plans?

Yes. The city lists preapproved ADU vendors whose plans move through review faster, including Acton ADU's Manzanita i448.

Will my property taxes go up?

Yes, for the new ADU. The ADU is assessed as new construction, and the city assigns it an address during the building permit process.

Do I have to live on the property?

Not for an ADU. Under state law since January 1, 2026, owner occupancy applies only to a Junior ADU that shares a bathroom with the house.

Get Help Navigating ADU Rules in San Jose

ADU regulations are constantly evolving and may vary by city, county, or even neighborhood. Before starting your project, it’s always best to consult with a trained professional or certified ADU Specialist to ensure your plans align with current local requirements.

On this page
OverviewADU types allowedKey regulationsPermit requirementsPermit timelineZoning and lot requirementsOfficial resources
See what fits on your lot
Enter your address to check what you can build on your property.
Check your property

Our work

See more
See ADU rules for all cities
Close

Check your property

Enter your address to see your lot and the plans that may fit it.

Get your ADU now

Get Free Estimate  →